New release of AHU Design v.3.1.4
(May 02, 2022)

Version 3.1.4 release contains following:

AHU Design application / GUI

  • Print window rendering two buttons
  • FAQ-link updated – Links to AHU Design webpage on Swegon.com
  • Bug-fix error when printing from newly sorted project

GOLD

  • Fix for TCBR and TCFE2, rules for selections and amounts
  • Fire & Smoke corrections. Placement of detector 1 under function 2 is now available.
  • Property information  on dropdownlist is added for TCBP
  • Logic structure correction for duct connection TCBP
  • Added ordering coded for filterkit for size 100 &120 (TBFZ-1-15-aa-b)
  • Bug-fix in flowchart corrected for Evacuation extract air.
 

SILVER

  • Update of rotor drive effects on all sizes.

COMPACT

  • Fixed dimensions for Compact Air size 3
  • Water coil fix in flowchart for Compact Air & Heat.

ALL GLOBAL RANGE

  • Circular damper and connection component: Manual selection of duct connections is changed. Duct dimension is adjusted to unit size.
  • Circular damper placement error is corrected.

GLOBAL PX

  • Frost protection method is requested to be selected at unit creation (together with already existing climate selection). It stops nothing, but highligts to the user that a selection is recommended.
  • Message corrected for cirkular connection (unavailable) selection, of size 14, 16.
  • Generic message: larger sizes, smaller sizes (i.e. not size specific).

GLOBAL PX TOP

  • Improved wiring diagram to incorporate terminalblock XB_6.